Harmonic current measurement, flicker Pst evaluation, reference impedance and AC source output measured on site under LAB Support Ltd.'s A2LA accredited ISO/IEC 17025 scope, by the LAB Support Southeast Asia team.
A harmonics and flicker system is an AC source, a reference impedance and an analyser working together. IEC 61000-4-7 sets the accuracy of the harmonic current measurement, IEC 61000-4-15 the flickermeter response, and IEC 61000-3-3 the reference impedance the flicker is measured through. An error in any one shifts the pass/fail decision of a product test, so all three are calibrated at the same visit.
| Parameter | Range | Common methods and standards |
|---|---|---|
| Harmonic current measurement | 0.25 A to 200 A, 50 Hz to 5 kHz | IEC/EN 61000-4-7, IEC 61000-3-2, power analyser |
| Flicker Pst | 0.9 to 1.1 | IEC/EN 61000-4-15, IEC 61000-3-3, power analyser |
| Reference impedance, resistance | 0.1 to 0.3 ohm | IEC/EN 61000-3-3, 4-wire DMM |
| Reference impedance, inductance | 0.1 mH to 0.5 mH at 50 and 60 Hz | IEC/EN 61000-3-3, LCR meter |
| AC source output voltage and frequency | 60 mV to 1500 V, 10 Hz to 100 kHz | DMM, power analyser |
| AC current, single and three phase | 10 mA to 600 A | DMM, clamp-on tester, power analyser |
The methods and standards shown are the ones most commonly requested. Within each parameter and range listed on the accredited scope, other calibration methods and standard editions can be supported under the flexible-scope provisions of LAB Support's A2LA accreditation. The measurement uncertainty for each parameter is stated on the certificate. Field calibration is included in the scope for every line above.
From our own calibration records. Any instrument within the scope can be calibrated; these are the ones we see most.
Yes. The rectangular voltage change test signals of IEC 61000-4-15 are applied and the Pst reading compared with the expected value.
Yes. Resistance and inductance of the reference impedance are measured at 50 and 60 Hz, since IEC 61000-3-3 defines the flicker result through them.
Yes, per phase, up to the current range of the scope.
Malaysia, Singapore and Vietnam, with Penang as the base. Other locations on request.
We reply within one working day with a quote or a plan.